
Chattogram Dhaka Oil Pipeline Project (CDPL)
PLC Card

Chattogram Dhaka Oil Pipeline Project (CDPL)
Work Stations

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)

Bhola 225 MW Combined Cycle Power Plant

Bhola 225 MW Combined Cycle Power Plant

Bhola 225 MW Combined Cycle Power Plant

230 KV Substation Worked BSPL

230 KV Substation Worked BSPL

230 KV Substation Worked BSPL

230 KV Substation Worked BSPL

230 KV Substation Worked BSPL

132 KV Substation Worked at Rajshahi

132 KV Substation Worked at Rajshahi

132 KV Substation Worked at Rajshahi

132 KV Substation Worked at Rajshahi

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)

Chattogram Dhaka Oil Pipeline Project (CDPL)
The Chattogram-Dhaka oil pipeline project is a 249 km pipeline built by the Bangladesh Petroleum Corporation (BPC) to transport fuel oil from Chattogram to Dhaka. In this project, we have worked on PLC automation. We have done SCADA shows using various sensors such as oil tank level transmitter, pressure, temperature, density sensors. We also worked through PLCs to monitor and feedback the commands of motor operators that are used in places for oil pumping. In addition, we have commissioned the work of showing the status of PDB,PMCC,Sub-station,Booster pump, Main pump, UPS, generator, solar, fire alarm, cathodic protection.

230 KV Substation Worked BSPL
That's a major accomplishment — congratulations! Completing the 230kV AIS (Air-Insulated Switchgear) substation work at the Baraka Shikolbaha Power Plant (108 MW) is a significant milestone, especially considering the scale and complexity of such infrastructure.If you're preparing a project summary, report, or announcement, I can help you craft something professional and impactful.

132 KV Substation Worked at Rajshahi
We are proud to announce the successful completion of the 132kV Air-Insulated Switchgear (AIS) Substation at Rajshahi, commissioned in 2018. This project was executed for the Power Grid Company of Bangladesh (PGCB) and included full-scope installation, testing, and commissioning.
This substation plays a vital role in strengthening the regional transmission network and improving grid reliability in northern Bangladesh.
